Project Description & Scope

Installation of new 1350 mm diameter concrete storm sewer, HDPE storm sewer, PVC sanitary sewer, 400 mm diameter PVC watermain, and the relocation of an existing 600 mm diameter concrete sanitary trunk sewer. This work was part of approximately 800 m of collector and arterial street construction.

Project Challenges

The new streets will handle high traffic volumes. The access points to the private commercial properties had to be strategically located for traffic safety. This involved several access points being shared between property owners.