Project Description & Scope

The project involved the hydraulic modelling of the overall water network for the Galway/Glencrest Development, sizing of the water reservoir and design of the water transmission mains (600 mm PVC DR18) and associated reservoir site work.

Project Challenges

The project required winter construction in order to maintain overall project schedule. This required innovative hoarding and heating techniques to ensure infrastructure would meet project specifications.